Projects

Our business is focused in the infrastructure industry, performing new installation and rehabilitation construction services. Our expertise enables us to confidently build projects requiring extensive engineering skills and problem solving abilities, under intense schedule demands.

  • Mladen Buntich Construction Co. was contracted by the The Los Angeles Department of Water & Power (LADWP). LADWP was building a new Reservoir Storage Facility at the Headworks spreading grounds, a 43-acre site adjacent to the Los Angeles River and between the City of Burbank and Griffith Park.
  • Mladen Buntich Construction Co. was contracted by the City of Los Angeles for this project consisting of the structural rehabilitation of 1.2 miles of deteriorated 75-inch diameter reinforced concrete sewer pipe that was originally constructed in 1924.
  • Mladen Buntich Construction Co. was contracted by Metropolitan Water District for the Critical Waterline Rehabilitation of a 12-foot high pressure waterline that services millions of Southern California residents.
  • Mladen Buntich Construction Co. was contracted by the Los Angeles Department of Public Works. 
  • Mladen Buntich Construction Co. was contracted by the Los Angeles County Sanitation Districts. 
  • Mladen Buntich Construction Co. was contracted by the Los Angeles County Sanitation Districts.
  • Mladen Buntich Construction Co. was contracted by the City of Los Angeles Bureau of Engineering to rehabilitate a failing 30” Sewer Line that was up to 100’ deep. 
  • Mladen Buntich Construction Co. was contracted by the East Bay Municipal Utilities District.
  • Stormwater Capture within a median easement improves water quality, increases water supply, enhances recreation, and improves the community.
  • This project involved enlarging an existing earthen tunnel to enhance structural integrity and increase capacity for water flows originating from the Merced River.

WANT BUNTICH TO BID ON YOUR NEXT PROJECT?

See Contact Below