Merced Irrigation District

This project involved enlarging an existing earthen tunnel to enhance structural integrity and increase capacity for water flows originating from the Merced River.

Enlarging the tunnel involved stabilizing the existing tunnel entrance and exit portals, re-grading the invert, expanding the horseshoe shape, reinforcing the tunnel lining, temporary dams, rock bolting, soil nailing, and an around the clock work schedule to meet the shortened work window.

 

Project Features include:

  • 1,500 Linear Foot of Tunnel Expansion
  • 19 Foot Diameter Tunnel
  • Fiber Reinforced Shotcrete Lining up to 8 inch
  • 100 Plus Grouted Rock Dowels
  • Rip Rap Placement

WANT BUNTICH TO BID ON YOUR NEXT PROJECT?

See Contact Below