4th & Slauson Sewer Pipeline Rehabilitation

Contractor of Choice
Mladen Buntich Construction Co. was contracted by the City of Los Angeles for this project consisting of the structural rehabilitation of 1.2 miles of deteriorated 75-inch diameter reinforced concrete sewer pipe that was originally constructed in 1924.
The existing sewer system consisted primarily of approximately 6,310 linear feet of reinforced concrete pipe with a 6.25-inch concrete wall and a 1-inch-thick vitrified clay tile lining, along with approximately 18 linear feet of three-ring brick sewer. The Buntich Project Team structurally rehabilitated the system using the sliplining method, installing a 66-inch inside-diameter fiberglass liner with a vinyl ester interior liner to restore the pipeline’s structural integrity and extend its service life.
Additional Project Features Include:
- Sliplining approximately 5,005 linear feet of 75-inch sewer with a new 66-inch inside-diameter liner.
- Sliplining approximately 1,050 linear feet of 75-inch sewer through a curved section using a new 66-inch inside-diameter liner.
- Reconstruction of approximately 194 linear feet of a bend using the cut-and-cover method.
- Reconstruction and encasement of approximately 46 linear feet of existing pipe.
- Cleaning and proofing of the host pipe prior to liner installation.
- Odor control using both liquid-phase and vapor-phase mitigation methods.
- Removal and disposal of approximately 2,000 tons of hazardous debris.
- Installation of annular space grouting.
- Installation of five new operation and maintenance access points.
- Installation and removal of seven access shafts utilizing beam-and-plate shoring and sheet piles.
- Rehabilitation of manholes using T-Lock systems.