Projects

Main Image copy

Santa Monica Low Flow Diversion

Located:

The Santa Monica Low Flow Diversion Project will make the cities beaches and bay waters safer and healthier.

Read More
308406_2258347890565_1491241368_n

Salinity Management Microtunnel, Phase 2A

Located:

The Salinity Management microtunnel project –Phase 2, has begun laying a 12,500 linear foot, 32-inch pipeline in the Port Heuneme area.

Read More
EVO Main Image

EVO Condominiums

Located: ,

Mladen Buntich Construction Co. installs a complex shoring system using a Non-Vibrating Sheet Piler, in the heart of downtown Los Angeles.

Read More
Silver Lake 05.08.2014 no. 1

Silver Lake Storage Replacement Project

Located: ,

The Los Angeles Department of Water & Power (LADWP) intends to build a new Reservoir Storage Facility adjacent to the Los Angeles River, between the City of Burbank and Griffith...

Read More
Foothill Feeder Main Picture.jpg

Foothill Feeder Santa Clara Valley Pipeline Repair

Located: ,

Mladen Buntich Construction Co. was requested to participate in an emergency response bid to an urgent utility clients need to repair a critical 17-foot diameter water supply pipeline.

Read More
Previous Next