Projects

Picture1

Reach 4A & 4B Sewer Pipeline Rehabilitation Project

Located:

This project consisted of the structural rehabilitation of approximately 7 miles of structurally deteriorated 42-inch diameter unlined reinforced concrete sewer pipe.

Read More
Main Image copy

Santa Monica Low Flow Diversion

Located:

The Santa Monica Low Flow Diversion Project will make the cities beaches and bay waters safer and healthier.

Read More
308406_2258347890565_1491241368_n

Salinity Management Microtunnel, Phase 2A

Located:

The Salinity Management microtunnel project –Phase 2, has begun laying a 12,500 linear foot, 32-inch pipeline in the Port Heuneme area.

Read More
EVO Main Image

EVO Condominiums

Located: ,

Mladen Buntich Construction Co. installs a complex shoring system using a Non-Vibrating Sheet Piler, in the heart of downtown Los Angeles.

Read More
Silver Lake 05.08.2014 no. 1

Silver Lake Storage Replacement Project

Located: ,

The Los Angeles Department of Water & Power (LADWP) intends to build a new Reservoir Storage Facility adjacent to the Los Angeles River, between the City of Burbank and Griffith...

Read More
Previous Next